Wires Group https://wiresgroup.com/ Voice of the Transmission Industry Tue, 20 May 2025 16:38:17 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.1 https://wiresgroup.com/wp-content/uploads/2020/08/favicon.ico Wires Group https://wiresgroup.com/ 32 32 Terms of Service https://wiresgroup.com/terms-of-service/ Tue, 20 May 2025 16:38:17 +0000 https://wiresgroup.com/?p=8815 Terms of Service

The post Terms of Service appeared first on Wires Group.

]]>
Please wait while the policy is loaded. If it does not load, please click here to view the policy.

The post Terms of Service appeared first on Wires Group.

]]>
Cookie Policy https://wiresgroup.com/cookie-policy/ Tue, 20 May 2025 16:38:06 +0000 https://wiresgroup.com/?p=8812 Cookie Policy

The post Cookie Policy appeared first on Wires Group.

]]>
Please wait while the policy is loaded. If it does not load, please click here to view the policy.

The post Cookie Policy appeared first on Wires Group.

]]>
Privacy Policy https://wiresgroup.com/privacy-policy/ Tue, 20 May 2025 16:37:34 +0000 https://wiresgroup.com/?p=8802 Privacy Policy

The post Privacy Policy appeared first on Wires Group.

]]>
Please wait while the policy is loaded. If it does not load, please click here to view the policy.

The post Privacy Policy appeared first on Wires Group.

]]>
Protected: The Abandoned Plant Incentive is a Critical Enabler of Transmission https://wiresgroup.com/the-abandoned-plant-incentive-is-a-critical-enabler-of-transmission/ Wed, 07 May 2025 14:06:28 +0000 https://wiresgroup.com/?p=8665 There is no excerpt because this is a protected post.

The post Protected: The Abandoned Plant Incentive is a Critical Enabler of Transmission appeared first on Wires Group.

]]>

Password Protected

To view this protected post, enter the password below:

The post Protected: The Abandoned Plant Incentive is a Critical Enabler of Transmission appeared first on Wires Group.

]]>
WIRES Tech Talk – The Digitizing of the Grid Through Digital Twins: A Path to Increased Efficiency https://wiresgroup.com/wires-tech-talk-the-digitizing-of-the-grid-through-digital-twins-a-path-to-increased-efficiency/ Mon, 14 Apr 2025 12:12:48 +0000 https://wiresgroup.com/?p=8453 May 8, 2025
Public Welcome

The post WIRES Tech Talk – The Digitizing of the Grid Through Digital Twins: A Path to Increased Efficiency appeared first on Wires Group.

]]>
WIRES Tech Talk – Open to the Public
Thursday, May 8

10 AM ET

Our growing energy requirements and the subsequent demands on the grid are becoming more urgent by the hour. To meet this challenge, grid managers are increasingly turning to advanced technologies like Digital Twins to optimize grid operations and accelerate expansion of new generation sources.

Digital Twins—virtual replicas of physical grid assets—enable real-time monitoring, predictive maintenance, and smarter decision-making. By integrating IoT, AI, and big data analytics, they provide deep insights into grid performance, helping to reduce inefficiencies and minimize downtime.

This session will explore cutting-edge solutions for grid congestion management, optimal power dispatch, and intelligent grid configuration. We will also showcase Enline’s latest Digital Twin technologies and introduce the concept of the Control Room of the Future.

The post WIRES Tech Talk – The Digitizing of the Grid Through Digital Twins: A Path to Increased Efficiency appeared first on Wires Group.

]]>
WIRES Spring Member Meeting 2025 https://wiresgroup.com/wires-spring-member-meeting-2025/ Thu, 13 Feb 2025 16:55:05 +0000 https://wiresgroup.com/?p=8369 April 2-3, 2025
The Broadmoor
Colorado Springs, CO

The post WIRES Spring Member Meeting 2025 appeared first on Wires Group.

]]>

Agenda

All events are Mountain Time.

Wednesday, April 2

6:00 – 9:00 pm MST
Cocktail Reception and Dinner

Thursday, April 3

8:00 – 9:00 am MST
Breakfast

In this short video from his keynote, Lanny discusses SPP’s historic Integrated Transmission Plan (ITP). The recently approved $7.7 billion project portfolio includes 2,333 miles of new transmission and 495 miles of transmission rebuilds to meet growing electricity demand and improve grid resilience. He highlights the impressive value and benefits of the transmission portfolio, including the expected economic impact of $88-95 billion in reduced APC, and the fact every dollar invested in the new portfolio will drive $8-9 of value. “That’s a good deal. It’s a really good deal.”

9:00 – 10:00 am
Keynote Address

Lanny Nickell, CEO of Southwest Power Pool (SPP)

10:00 – 11:15 am
Panel 1 – AI & Data Center Demand: What Does It Mean For Transmission?

Panelists:
Patrick Arness, Federal Affairs, Dominion Energy
Cy McNeill, Director, Federal Energy Policy, Data Center Coalition
Aubrey Johnson, VP of System & Resource Planning, MISO Energy

Moderator:
Michael Tierney, Account Director, Continuum Industries

11:15 – 11:30 am
Coffee Break

11:30 – 12:30 pm
Panel 2 – Energy Decision-making in the New Administration and the Roles of FERC, DOE & the National Energy Dominance Council

Panelists:
Craig Glazer, VP of Federal Government Policy, PJM Interconnection
Maria Robinson, Former Director of DOE Grid Deployment Office
Norman Bay, Head of Energy Regulatory & Enforcement Group, Willkie Farr & Gallagher

Moderator:
Zack Hale, Federal Energy Policy Reporter, S&P Global Platts

12:30 – 2:00 pm
Lunch

Location

The Broadmore, Colorado Springs, CO

The Spring Member Meeting will be held at The Broadmoor in Colorado Springs, CO

This is an invitation-only event.

Event Program

WIRES Spring 2025 Member Meeting Agenda & Program

The post WIRES Spring Member Meeting 2025 appeared first on Wires Group.

]]>
WIRES Statement on Local Transmission Planning FERC Complaint https://wiresgroup.com/wires-statement-on-local-transmission-planning-ferc-complaint/ Fri, 20 Dec 2024 17:07:19 +0000 https://wiresgroup.com/?p=8273 The recent complaint challenging local transmission planning will only make it more difficult, more costly, and take longer to get transmission built throughout the United States,” said Larry Gasteiger, Executive Director of WIRES. “This is the needed transmission which is critical to delivering reliable power to customers in a cost effective and timely manner, and […]

The post WIRES Statement on Local Transmission Planning FERC Complaint appeared first on Wires Group.

]]>
The recent complaint challenging local transmission planning will only make it more difficult, more costly, and take longer to get transmission built throughout the United States,” said Larry Gasteiger, Executive Director of WIRES. “This is the needed transmission which is critical to delivering reliable power to customers in a cost effective and timely manner, and that is essential to facilitating economic growth, ensuring national security, and interconnecting new businesses. The complaint seeks to burden FERC and all transmission developers and interested stakeholders with unnecessary, inefficient, and cumbersome new processes and requirements for planning and building transmission. It is needlessly distracting and will divert FERC and industry resources from important work on ongoing regional transmission planning and compliance with FERC Orders 2023 and 1920. FERC should dismiss the complaint swiftly so everyone can return to the important work of quickly and efficiently meeting the country’s pressing transmission needs.

The post WIRES Statement on Local Transmission Planning FERC Complaint appeared first on Wires Group.

]]>
WIRES Announces 2025 Officers and Board of Directors https://wiresgroup.com/wires-announces-2025-officers-and-board-of-directors/ Mon, 25 Nov 2024 13:20:08 +0000 https://wiresgroup.com/?p=8258 WIRES, the transmission trade association that promotes investment in all aspects of the high-voltage grid, announced today its 2025 leadership team, with Amanda Rumsey, Manager, RTO and Federal Regulatory Policy, PPL Corporation, elected as WIRES President.

The post WIRES Announces 2025 Officers and Board of Directors appeared first on Wires Group.

]]>
Amanda Rumsey, Manager, RTO and Federal Regulatory Policy, PPL Corporation, Named WIRES President

WASHINGTON – Nov. 25, 2024 – WIRES, the transmission trade association that promotes investment in all aspects of the high-voltage grid, announced today its 2025 leadership team, with Amanda Rumsey, Manager, RTO and Federal Regulatory Policy, PPL Corporation, elected as WIRES President.

WIRES 2025 Officers:

  • President: Amanda Rumsey, Manager, RTO and Federal Regulatory Policy, PPL
  • Vice President: David Burnham, Director, Transmission Policy, Eversource Energy
  • Secretary: Jamie Simler, Vice President, Federal Regulatory Affairs, Ameren
  • Treasurer: Devin McMackin, Director, Federal Affairs, ITC ‎Holdings

“WIRES continues to actively engage on behalf of a growing list of transmission owners with regulators, legislators and other policymakers to advance policies that will accelerate the build out of critically needed and beneficial transmission,” said Larry Gasteiger, Executive Director of WIRES. “In 2025 WIRES will continue our efforts to raise awareness of the economic and national security importance of a robust and resilient grid. I am looking forward to working closely with the incoming WIRES president, Amanda Rumsey, and the entire 2025 leadership team, and I want to thank the WIRES 2024 Officers and Board of Directors for their dedication and service.”

Jodi Moskowitz, WIRES’ current president, will join the WIRES Board of Directors in 2025. Kerry Powell, Vice President, Grid Integration at Duke Energy was elected to a two-year board term. Tom Hestermann, Retired, Manager, Transmission Policy, Sunflower Electric Power Corp., will step down from the board at the end of 2024

WIRES 2025 Board of Directors:

2025 Board Members
  • Jodi Moskowitz, Deputy General Counsel & RTO Strategy Officer, PSEG
  • Stacey Burbure, Vice President of FERC & RTO Strategy & Policy, American Electric Power (AEP)
  • Brian Gemmell, Chief Operating Officer, NY Electric, National Grid
  • Kerry Powell, Vice President, Grid Integration, Duke Energy
  • Dave Weaver, Vice President, Transmission Strategy, Exelon

“The unprecedented increase in power demand from data centers and the resurgence of onshore manufacturing underscores the need for accelerated investments in the nation’s transmission infrastructure to ensure reliability and resiliency for customers and support business growth and development,” said Amanda Rumsey, Manager, RTO and Federal Regulatory Policy, PPL and WIRES incoming 2025 president. “I look forward to working with Larry Gasteiger and the WIRES leadership team to educate policymakers and key stakeholders on the benefits of a strong, technology-driven transmission system, the need to hasten the build out of this vital infrastructure, and the importance of regulatory certainty to encourage investment in transmission.”

The post WIRES Announces 2025 Officers and Board of Directors appeared first on Wires Group.

]]>
WIRES Tech Talk – Expanding Grid Capacity on Existing Right-of-Ways with ExoGrid https://wiresgroup.com/wires-tech-talk-expanding-grid-capacity-on-existing-right-of-ways-with-exogrid/ Tue, 05 Nov 2024 15:58:12 +0000 https://wiresgroup.com/?p=8210 November 22, 2024
Public Welcome

The post WIRES Tech Talk – Expanding Grid Capacity on Existing Right-of-Ways with ExoGrid appeared first on Wires Group.

]]>
WIRES Tech Talk – Open to the Public
Friday, November 22, 2024

10-11 AM ET

Earlier this year our WIRES members heard about Ampjack’s Energized Tower Raising system that can be utilized to rerate transmission lines to help deal with the ever-growing load requirements on the transmission grid. Now Ampjack has introduced another innovative product: ExoGrid™– a revolutionary technology that transforms current infrastructure by utilizing existing tower locations and Right-of-Ways (ROWs) to exponentially increase grid capacity.

ExoGrid™ brings a new versatility to the transmission marketplace that allows for existing transmission tower locations to be utilized to create new, and unique structural improvements to bring additional circuits, harden existing infrastructure, or convert existing towers for new uses, all while staying within the existing ROW. The sky is no longer the limit when it comes to expanding transmission capacity using ExGrid™.

The post WIRES Tech Talk – Expanding Grid Capacity on Existing Right-of-Ways with ExoGrid appeared first on Wires Group.

]]>
WIRES Tech Talk – Navigating the Transmission and Grid Construction Landscape https://wiresgroup.com/wires-tech-talk-navigating-the-transmission-and-grid-construction-landscape/ Mon, 07 Oct 2024 21:24:16 +0000 https://wiresgroup.com/?p=8055 October 22, 2024
Public Welcome

The post WIRES Tech Talk – Navigating the Transmission and Grid Construction Landscape appeared first on Wires Group.

]]>
WIRES Tech Talk – Open to the Public
Tuesday, October 22, 2024

2-3 PM ET

Join WIRES for another tech talk, featuring Alex Lichman of Bureau Veritas. Alex will talk about navigating the complexities of transmission construction management, providing valuable insights for industry stakeholders to effectively navigate the evolving landscape, ensuring the successful delivery of projects that meet both economic and environmental goals. From project management and regulations to safety standards and sustainability practices and agency communication, Alex will share lessons learned from BV’s extensive renewable power generation and transmission experience.

The post WIRES Tech Talk – Navigating the Transmission and Grid Construction Landscape appeared first on Wires Group.

]]>